This project is an emergency response to the bankside exposure of the Town of Keene water main pipe running under the East Branch Ausable River. The 12” diameter pipe is located approximately 3,000 channel feet downstream/north of the SR73 Bridge in the hamlet of Keene. The pipe carries approximately 90% of the Town’s water supply.

Keene Water Main Narrative.pdf